Enhancing Municipal Water Infrastructure

The Radon, Iron, and Manganese Removal Facility Improvements project

Battle Creek’s Radon, Iron, and Manganese Removal Facility Improvements project.

In the ever-evolving landscape of municipal water treatment, maintaining the integrity and performance of facilities is paramount. The Radon, Iron, and Manganese Removal Facility Improvements project undertaken by Jones & Henry Engineers, Ltd. in Battle Creek, Michigan, is a good example. The project not only reinvigorated the aging infrastructure of the Verona Water Treatment Plant but also laid the groundwork for future enhancements in water safety and quality.

Project Overview

The Radon, Iron, and Manganese Removal Facility Improvements project (Project Number: 2019-056B) was initiated to upgrade the Verona Water Treatment Plant, which has proudly served the citizens of Battle Creek since 1996. Utilizing aeration, contact, and rapid sand filtration processes, the facility was designed to remove naturally occurring contaminants from the groundwater drawn from the Marshall Sandstone Aquifer.

One prominent challenge during the project was addressing the outdated design of the existing facility. The original plant design allowed bypassing, a practice that no longer meets current state regulations for radon removal facilities. Furthermore, it lacked provisions for isolating plant sections for maintenance. To tackle this, Jones & Henry Engineers developed a strategic stop-log system. This ingenious solution not only facilitated the construction of this essential project but also simplified future maintenance tasks, ensuring that service to our community remains uninterrupted.

The COVID-19 pandemic presented additional hurdles, limiting direct interactions between City staff and construction teams. However, Jones & Henry stepped in as effective intermediaries, ensuring that communication flowed smoothly between all parties while prioritizing health and safety measures.

Engineering Enhancements

The project encompassed a range of vital engineering upgrades that have greatly improved operations. The aging filter beds at the plant were completely removed and replaced, resulting in enhanced particle separation capabilities. Alongside this, the backwashing system was automated, and filtration bypass systems were implemented, streamlining maintenance and improving overall operational efficiency.

In addition to these advancements, significant mechanical and electrical upgrades were made. Variable Frequency Drives (VFDs) were installed on low-service pumps, and various mechanical components were upgraded, leading to improved system performance.

Energy-efficient upgrades to climate control systems and lighting also contributed to the enhancements, significantly boosting efficiency at both the removal facility and the adjacent Verona Pumping Station. Looking ahead, the facility was designed with future-proofing in mind, allowing for proactive treatment of emerging contaminants, such as PFAS, and accommodating potential future filtration processes.

The Radon, Iron, and Manganese Removal Facility Improvements project

Impact and Results

Completed in late 2020, the enhancements implemented in the Radon, Iron, and Manganese Removal Facility have produced remarkable improvements in water quality. The efficiency of iron and manganese removal has significantly increased, resulting in clearer, tastier, and odor-free drinking water for residents in Battle Creek, Springfield, Emmett Township, and Pennfield Township.

Not only did this project effectively address immediate infrastructural challenges, but it also positioned the facility to tackle future water treatment challenges head-on, ensuring a continuous supply of safe drinking water for our community.

Conclusion

The successful completion of the Radon, Iron, and Manganese Removal Facility Improvements Project stands as a testament to the dedication and excellence of Jones & Henry Engineers in municipal engineering. By forging a close partnership with the City of Battle Creek and navigating a range of complex challenges, Jones & Henry has made a significant contribution to public health and safety by enhancing water treatment infrastructure. As community needs evolve, so will the vital role of engineering in delivering effective and sustainable solutions for our essential municipal services.

Radon, Iron, and Manganese Removal Facility Improvements

Well-equipped to address your community’s challenges.

We use a century of engineering experience to determine the most appropriate treatment plant design processes.