How Ebenezer Scrooge learned to love capital improvement plans.
Every winter, as temperatures plummet and frost settles over the aeration basins, a familiar tale unfolds across municipal utility departments everywhere. It is the story of the tight-fisted budget-cutter, the overworked plant operator, and the timeless magic of sound civil engineering. Grab a cup of hot cocoa and settle in for a holiday classic, reimagined for the water and wastewater world.
Stave I: Marley’s Corroded Chain
Ebenezer Scrooge, the notoriously frugal City Manager of Littleton, hated two things: holiday cheer and preventive maintenance. To Scrooge, infrastructure spending was literally money down the drain.
On Christmas Eve, Scrooge sat in his chilly office, slashing line items from the upcoming municipal budget. Across the room, his dedicated Utilities Superintendent, Bob Cratchit, was frantically trying to keep the city’s 50-year-old wastewater treatment plant running with little more than duct tape and optimism.
“Mr. Scrooge, sir,” Cratchit pleaded, “the lift station pumps are cavitating, and inflow and infiltration are through the roof. We really should bring in Jones & Henry Engineers to conduct a facility plan before the spring thaw.”
“Facility plans? Capital improvements? Humbug!” Scrooge barked. “If the water is still moving, the pipes are fine! Now turn down the thermostat in the lab—we’re wasting money heating the microorganisms!”
That night, as Scrooge sat alone eating lukewarm soup, his plumbing let out a terrifying groan. Out of the shadows rattled the ghost of his former water commissioner, Jacob Marley. Marley was weighed down by a massive, clanking chain forged from Combined Sewer Overflow consent decrees.
“I wear the chain I forged in life, Ebenezer!” Marley wailed. “I deferred maintenance! I ignored the asset management plan! Change your ways, or you will spend eternity trapped in a perpetual sanitary sewer overflow!”
Before Scrooge could reply, Marley vanished, warning that three spirits would visit him before dawn.
Stave II: The Three Spirits of Infrastructure
The Ghost of Infrastructure Past arrived first, wearing a retro hard hat and carrying original 1926 linen drawings by Harvey P. Jones. The spirit whisked Scrooge back to the grand opening of Littleton’s original waterworks. Scrooge watched in awe as proud townsfolk marveled at the clean water flowing from their taps.
“This system was built to last, Ebenezer,” the spirit said softly. “But even the finest concrete and steel require stewardship. You cannot expect a century-old system to handle modern peak flows without a little help.”
Next came The Ghost of Infrastructure Present, decked out in a glowing high-visibility vest and holding a tablet displaying an OptimizerPS-generated digital twin of Littleton’s collection system. The spirit showed Scrooge a team of Jones & Henry engineers hard at work, designing energy-efficient oxidation ditches, ultraviolet (UV) disinfection, anaerobic digestion, and nutrient removal, while mapping out lead service line replacements to protect the community.
They then visited Bob Cratchit’s humble home. In the corner sat a failing lift station pump. “Spirit,” Scrooge asked, suddenly concerned, “tell me that will be upgraded soon!”
“If these budgets remain frozen,” the spirit replied gravely, “I see a vacant corner—and a state-mandated moratorium on all new housing permits in Littleton.”
Finally, The Ghost of Infrastructure Yet to Come appeared, cloaked in a heavy black tarp. Silently, the phantom pointed toward the Great Lakes tributary in the year 2028. Scrooge gasped. The un-upgraded treatment plant was completely overwhelmed by a 100-year storm event. Harmful Algal Blooms choked the waterway, and a mountain of regulatory fines sat on City Hall’s steps. In a muddy field, Scrooge wiped grime from a weathered headstone that read: Littleton Utilities: Under Receivership.
“No, Spirit!” Scrooge cried, dropping to his knees. “I see the error of my ways! I will fund the master plan! I will authorize the pilot study! Just give me another chance!”
Stave III: A Very Compliant Christmas
Scrooge awoke on Christmas morning tangled in his bedsheets, his heart overflowing with holiday spirit—and a newfound appreciation for civil engineering. He threw open his window and shouted to a passerby, “What day is it?!”
“Why, it’s Christmas Day, sir!”
“Splendid! The headworks screens are still holding!”
Scrooge immediately picked up the phone and called Bob Cratchit. “Merry Christmas, Bob! I’m giving you a raise, restoring the lab’s heating budget, and, first thing tomorrow morning, we are hiring Jones & Henry Engineers to provide project funding assistance, grant support, and cost-of-service rate studies to save the city money! We’re breaking ground on those new secondary clarifiers by spring!”
By the following holiday season, Littleton’s water was sparkling clear, the SCADA alarms and standby generators were silent, and the city’s infrastructure was built to thrive for another hundred years.
And as Bob Cratchit famously said at the annual operator’s luncheon: “God bless us, every one—and may your dissolved oxygen levels always be optimal!”