Jones & Henry has partnered with the City of Carmel since 1991.

Carmel Indiana

In 1989, Jones & Henry opened a new office in Indiana to serve their Indiana clients. Since then, professionalism and service have nurtured a growing and loyal client following.

The City of Carmel teamed with Jones & Henry for the first time in 1991.  Successful updates to the City’s water and wastewater master plans became the cornerstone of the foundation for a successful and enduring relationship. From the beginning, Jones & Henry has provided quality, capable engineering, dedication, and service to Carmel.

As the City of Carmel grew, so too did the demands on infrastructure and services. The planning, design, and construction of improvements to the water and wastewater utilities became critical. After all, a city cannot grow, succeed, and thrive without the lifeblood of its utilities.

Planning for the Future

The City has since built most of the improvements recommended in the master plan updates. As the years passed, Carmel utility personnel have worked with Jones & Henry to provide superior utility service and value to city residents.

Hidden, But Not Forgotten

Good planning and engineering include putting appropriately sized water and sewer infrastructure in place. Good management and maintenance ensure a long and useful life as the utility ages; equipment and pipelines must be replaced, repaired, or rehabilitated to extend the life of the infrastructure. Although most of the infrastructure is buried and hidden, we cannot forget it.

Appropriately sized and well-maintained water and wastewater infrastructure is a tremendous asset to the City of Carmel. Jones & Henry is proud to have assisted the City in planning and managing this infrastructure.

Regulatory Challenges

Protecting the environment is of paramount concern to Jones & Henry and the City of Carmel. Regulations intended to protect the environment are continually changing. Meeting the changing regulations with advanced technology in an economically viable way is a constant challenge. The City of Carmel has met that challenge by working with Jones & Henry using a team approach. In fact, the City of Carmel has become one of the most cost-effective utilities in the state of Indiana.

A Creative and Innovative Team

Good planning and management require a continuing team effort. Jones & Henry, in concert with utility personnel, have developed creative and innovative ideas. The wastewater utility treatment process features a world-class BioPasteur system and a green energy solar drying system for the biosolids program. Each year, the biosolids give-away program grows and adds valuable nutrients to Carmel’s Master Gardeners and their landscapes.

Unique and Evolving

The water utility has designed a treatment plant that will turn an eyesore industrial site into a state-of-the-art water facility. The project provides storage for the world’s most valuable commodity: water. The utility provides all of this to the community at rates among the lowest in the state.

The water utility features a two-million-gallon elevated water storage tank, with the option of installing multiple floors within the column for future offices. Jones & Henry, working with city personnel, designed this project.

As Carmel continues to expand, the City is not only a jewel of Indiana but a unique and noteworthy part of America. Carmel began as a bedroom community in Indianapolis and provided an escape from the chaos of Circle City. Since then, Carmel has evolved into a community rich in arts, culture, cuisine, and entertainment.

Carmel is a friendly, diverse community woven with Midwest values accentuated by metropolitan amenities. Many of its residents have discovered it as the “right-sized” community they seek.

Jones & Henry is thankful and proud to be a part of the continued prosperity of the City of Carmel and the partnership that has led to the success of the City’s utilities for more than 30 years.